Monday, October 25, 2010

FG Commences Passenger Service on Warri - Ajaokuta Railway Soon

Warri - Ajaokuta Raiway.

Going by the pace of  current rehabilitation work  by Julius Berger Nigeria Plc on the 254 kilometre  Ajaokuta - warri rail line, the Federal Government has stated that  passengers service between the Niger Delta and Middle Belt areas of the country  will commence  very soon.
Impressed with the less than  4 hour train ride from Agbarho near Warri Delta State to Ajaokuta in Kogi State on the new Standard Gauge track line, Minister of Transport, Alhaji Suleiman Yusuf  said "After the review, transfer and re - scoping of the project valued at N36billion  from the Federal Ministry of Power and Mining to the Federal Ministry of Transport from its purely  freight of Iron ore and with an additional built in design for Passengers movement  which will involve  the construction of several train stations along the line, I'm satisfied and impressed today that with this 4 hour train ride from Warri to Ajaokuta, we are sure to commence passenger services  early next year."
However, he said the project  will involve the  completion of the 10 train stations which would have been built along the 254 kilometre  Standard Gauge track way between Warri and Itakpe.
The Minister added  that the additional 22 kilometre linking the Delta Steel Jetty in Warri will  bring the entire project rail line to 276 kilometre is sustained and  finally be completed in 2012 if the pace of ongoing rehabilitation by the Consultants Technics Engineering Architecture Marketing Nigeria Limited (TEAM) and the Contractors, Julius Berger Nigeria Plc.

Source:http://www.thisdayonline.info/nview.php?id=185978

No comments:

Post a Comment